VTU Notes | 18CS35 | SOFTWARE ENGINEERING

Software Processes

Module-1

  • 4.9
  • 2018 Scheme | CSE Department

18CS35 | SOFTWARE ENGINEERING | Module-1 VTU Notes




VTU | 18CS35 | Module - 1


Certainly, here's a summary of the software process models, namely the Waterfall Model, Incremental Model, and Spiral Model, along with an overview of process activities:


Waterfall Model (Section 2.1.1)


- Description: The Waterfall Model is a sequential and linear software development process. It divides the software development lifecycle into distinct phases, where each phase must be completed before moving to the next.

- Phases: The typical phases in the Waterfall Model include Requirements Analysis, System Design, Implementation, Testing, Deployment, and Maintenance.

- Advantages: It provides a structured and well-documented approach. Each phase is self-contained, making it easier to manage. It's suitable for projects with well-defined requirements.


- Disadvantages: It's less adaptable to changing requirements. Errors detected late in the process can be costly to fix.


Incremental Model (Section 2.1.2)


- Description: The Incremental Model breaks the software development process into smaller, manageable parts called increments. Each increment represents a portion of the final product, and these increments are developed iteratively.


- Phases: The project starts with a partial but functional system. New functionality is added incrementally in subsequent iterations. Each increment goes through phases like Requirements, Design, Implementation, and Testing.


- Advantages: It allows for early delivery of a partial product. It accommodates changes and enhancements more effectively. Testing and debugging are done incrementally.


- Disadvantages: Managing dependencies between increments can be challenging. It may not be suitable for all projects, especially those with highly interdependent features.


Spiral Model (Section 2.1.3)


- Description: The Spiral Model is a risk-driven approach that combines iterative development with elements of the Waterfall Model. It emphasizes risk analysis and management throughout the project's life cycle.


- Phases: The Spiral Model comprises four main phases: Planning, Risk Analysis, Engineering (including design, coding, and testing), and Evaluation. These phases are iteratively applied.


- Advantages: It's flexible and accommodates changes due to its iterative nature. It prioritizes risk management, making it well-suited for complex and high-risk projects.


- Disadvantages: It can be more time-consuming and costly than other models. The level of risk analysis and management can vary, potentially leading to insufficient risk mitigation.


Process Activities (Overview)


Software process activities refer to the fundamental tasks and actions involved in software development. These activities typically include:


- Requirements Engineering: Gathering, analyzing, and documenting user and system requirements.


- System Design: Creating a high-level design of the software system, including architecture and data models.


- Implementation: Writing code, developing software components, and integrating them into a functional whole.


- Testing: Verification and validation of the software to ensure it meets the specified requirements.


- Deployment: Installing and configuring the software in its intended environment.


- Maintenance: Ongoing support, bug fixes, updates, and enhancements throughout the software's lifecycle.


- Planning and Project Management: Activities related to project planning, scheduling, resource allocation, and risk management.


- Quality Assurance: Ensuring that the software meets quality standards and adheres to best practices.


These activities may vary in importance and sequence depending on the chosen software development model. The choice of model influences how these activities are organized and executed during the software development process.



Course Faq

Announcement

AcquireHowTo

Admin 1 year ago

Upcomming Updates of the AcquireHowTo

  • -- CGPA/SGPA Calculator with University Filter.
  • -- Student Projects Guide and Download.
  • -- Article Publishing platform for different categories.
  • -- Courses for students on different topics.
  • -- Student Dashboard for AcquireHowTo Products.
  • -- Online Portal to buy Minor Projects and Major Projects.
  • -- Last year Exams Question paper .
  • These all updates are comming soon on our portal. Once the updates roll out you will be notified.

18CS35 | SOFTWARE ENGINEERING Vtu Notes
3rd
Semester
5044
Total Views

3rd Sem CSE Department VTU Notes
Full lifetime access
10+ downloadable resources
Assignments
Question Papers

© copyright 2021 VtuNotes child of AcquireHowTo